Photo by Jason Mavrommatis on Unsplash (Unsplash License)
Quick Answer: Natural gas power plant requests in ERCOT’s generation interconnection queue reached 95,032 MW as of October 31, 2026, nearly double the 47,848 MW a year earlier, according to ERCOT’s monthly operational overview. Gas now makes up about 21% of the 461,414 MW queue, while solar and battery requests have declined from a year ago.
The list of power plants that developers want to connect to the Texas grid has changed shape in a single year. In October 2025, the Electric Reliability Council of Texas queue was dominated by batteries and solar farms, with gas holding barely more than a tenth of the total, just ahead of wind. By the end of October 2026, gas-fired generation had climbed to roughly 95 gigawatts of requests, making it the third-largest fuel in the queue and the fastest-growing by a wide margin.
The shift is visible in ERCOT’s own monthly reports to its board and stakeholders. It reflects a grid that set an October demand record this year, a load forecast that ERCOT itself has called higher than expected future growth, and a state policy framework that has pushed hard for dispatchable generation. This report breaks down what the queue numbers show, what they do not show, and why they matter for Texas energy businesses.
How big is the ERCOT interconnection queue right now?
ERCOT reported that it was tracking 1,847 active generation interconnection requests totaling 461,414 MW as of October 31, 2026. A year earlier, as of October 31, 2025, the grid operator was tracking 1,999 active requests totaling 431,985 MW.
That means the queue has fewer projects but more megawatts. The number of active requests fell by 152, or about 7.6%, while total capacity rose by 29,429 MW, or about 6.8%. The average request grew from roughly 216 MW to roughly 250 MW, a sign that the projects now entering the queue are larger on average than the ones leaving it.
ERCOT also classified 169 projects as inactive in October 2026, down from 175 in September. A year earlier, 142 projects were inactive. Inactive projects are excluded from ERCOT’s fuel-type totals. Separately, ERCOT listed 30 small generator projects totaling 263 MW in its simplified review process, compared with 56 projects totaling 523 MW in October 2025.
| Fuel | Oct. 31, 2025 (MW) | Oct. 31, 2026 (MW) | Change (MW) | Change (%) |
|---|---|---|---|---|
| Battery storage | 175,579 | 160,102 | -15,477 | -8.8% |
| Solar | 158,151 | 151,798 | -6,353 | -4.0% |
| Natural gas | 47,848 | 95,032 | +47,184 | +98.6% |
| Wind | 46,422 | 49,781 | +3,359 | +7.2% |
| Other (nuclear, hydro, geothermal and more) | 3,985 | 4,701 | +716 | +18.0% |
| Total | 431,985 | 461,414 | +29,429 | +6.8% |
| Active requests (count) | 1,999 | 1,847 | -152 | -7.6% |
Source: ERCOT Monthly Operational Overview, October 2025 and October 2026 (Planning Summary). “Other” is calculated as the total minus the four listed fuels.
Why are natural gas requests surging in ERCOT?
The gas numbers have risen at an unusual pace even within 2026. ERCOT’s September 2026 interconnection update to its Board of Directors reported gas requests of 80 GW, up 23% from 65 GW at the time of the June board update, and noted 26 new gas generation requests in the prior 60 days. By the October 31 snapshot, the figure had reached 95,032 MW. In other words, gas requests rose by roughly 30 GW in about four months.
Several forces visible in ERCOT’s data line up behind that trend.
Demand is setting records
ERCOT set a new October demand record of 81,487 MW on October 13, 2026, according to its preliminary data. That was 5,583 MW above the October 2025 peak of 75,904 MW. Total energy generation in October rose 1.5% year over year to 41,596 GWh. Power demand in a shoulder month like October once sat well below summer peaks; higher autumn records indicate a base of load that is rising across the calendar, not just in heat waves.
Large loads are already on the system
ERCOT reported that 9,456 MW of large loads had received approval to energize as of its October 2026 overview, and that it had observed a non-simultaneous monthly peak consumption of 5,115 MW from those loads in October. In the October 2025 overview, the comparable approved figure was 7,502 MW with observed peak consumption of 3,960 MW. Approved large-load capacity therefore rose by about 1,950 MW and observed peak consumption by about 1,155 MW in roughly a year.
The long-term forecast is enormous
In April 2026, ERCOT filed a preliminary Long-Term Load Forecast for 2026 through 2032 that projected approximately 367,790 MW of demand in the ERCOT region by 2032. ERCOT President and CEO Pablo Vegas said at the time that the grid operator believed the forecast “to be higher than expected future load growth.” ERCOT described the forecast as a snapshot that informs planning and “not a prediction of what will be built.” Even a heavily discounted version of that outlook implies a need for much more generation, and gas plants can run around the clock in a way that solar and batteries alone cannot.
How fast did the queue change during 2026?
Comparing ERCOT’s September board update with the October 31 snapshot shows how quickly the mix moved in just a few months. The September deck listed solar at 158 GW, battery storage at 166 GW with 398 GWh of energy capacity, gas at 80 GW, wind at 49 GW and other fuels at 4 GW. By October 31, solar had slipped to about 152 GW, batteries to about 160 GW and 384 GWh, and gas had jumped to 95 GW. Wind edged up to about 50 GW. In that short window, gas gained roughly 15 GW while solar and storage together gave up roughly 12 GW.
How have October demand peaks trended?
ERCOT’s October reports show a steady climb in fall demand. The October 2024 peak was 72,550 MW, according to the October 2025 overview. October 2025 reached about 75,900 MW, with the preliminary figure of 75,889 MW later shown as 75,904 MW in the 2026 report. October 2026 hit 81,487 MW. That is an increase of nearly 9,000 MW, or about 12%, in two years for the same calendar month. Energy generation in October 2025 had risen 4.4% from October 2024, and October 2026 added another 1.5%.
Are solar and battery projects leaving the Texas queue?
Solar and storage requests have declined, but they still make up most of the queue. Battery storage requests stood at 160,102 MW in October 2026, down 8.8% from a year earlier, and represented 34.7% of queue capacity. ERCOT listed battery energy capacity at 384 GWh, implying an average duration of about 2.4 hours across the storage requests. Solar requests totaled 151,798 MW, or 32.9% of the queue, down 4.0%.
The share changes are more dramatic than the megawatt changes. A year ago, ERCOT’s fuel chart showed battery storage at 40.6% of the queue, solar at 36.6%, gas at 11.1% and wind at 10.7%. In October 2026, the split was battery 34.7%, solar 32.9%, gas 20.6%, wind 10.8% and other fuels 1%.
| Fuel | Oct. 2025 | Sept. 2026 board update | Oct. 2026 |
|---|---|---|---|
| Battery | 40.6% | 36.3% | 34.7% |
| Solar | 36.6% | 34.6% | 32.9% |
| Gas | 11.1% | 17.6% | 20.6% |
| Wind | 10.7% | 10.7% | 10.8% |
| Other | 0.9% | 0.9% | 1.0% |
Source: ERCOT Monthly Operational Overviews (October 2025, October 2026) and Interconnection and Grid Analysis Update to the ERCOT Board, September 2026.
Is wind making a comeback?
Wind is the one renewable category whose queue grew. Requests rose 7.2% to 49,781 MW, and wind held a steady share of about 10.7% to 10.8%. Wind’s queue position has been stable while solar and storage gave up share to gas.
Does a big queue mean these plants will be built?
No. The interconnection queue measures requests to study a connection to the grid, not committed construction. Many projects in any queue are speculative, are later withdrawn, or change size and timing during study. ERCOT’s own inactive category, which rose from 142 projects a year ago to 169 in October 2026, shows that a meaningful number of requests stall.
The total queue of more than 461,000 MW is several times ERCOT’s record demand levels, which by itself shows that most requests will never become operating plants. The value of the queue data is in its direction. It shows where developer capital and attention are moving, and in 2026 that movement is toward gas.
What happens to existing solar, wind and battery plants under new ride-through rules?
ERCOT’s September board update also tracked compliance status under NOGRR 245, the rule revision covering ride-through performance for inverter-based resources such as solar, wind and battery plants. As of August 24, 2026, ERCOT listed 93 resources totaling 11,049 MW with extensions approved, 116 resources totaling 13,305 MW pending a reliability assessment, 37 resources totaling 3,001 MW pending determination, and 25 resources totaling 2,688 MW denied. The figures show that the operating fleet of inverter-based plants is also being asked to meet stricter performance standards while new projects queue up.
| Active generation requests (Oct. 31, 2026) | 1,847 projects, 461,414 MW |
| Gas requests | 95,032 MW (up from 47,848 MW a year earlier) |
| Gas requests, June and September 2026 board updates | 65 GW, then 80 GW |
| Battery storage requests | 160,102 MW / 384 GWh |
| Inactive projects | 169 (142 a year earlier) |
| October 2026 peak demand | 81,487 MW on Oct. 13 (preliminary record for October) |
| October 2026 energy generation | 41,596 GWh, up 1.5% |
| Large loads approved to energize | 9,456 MW; 5,115 MW observed October peak |
| Preliminary 2032 load forecast (April 2026) | About 367,790 MW |
What does the queue shift mean for Texas energy businesses?
Gas turbine and pipeline supply chains
A near-doubling of gas generation requests in one year points to more demand for turbines, engines, transformers, interconnection equipment and gas supply. Each new gas plant that advances needs a pipeline connection and firm or interruptible fuel arrangements, which ties the power queue directly to the state’s midstream sector. Texas producers and pipeline operators have a stake in how many of those 95 GW of requests move to construction.
Developers and investors in renewables and storage
Solar and battery developers still hold about two-thirds of the queue’s capacity, and the drop in their totals was modest compared with the jump in gas. But the change in mix means more competition for interconnection studies, transmission capacity and equipment, and a market in which dispatchable resources are attracting a larger share of new project filings.
Large energy users
For data centers, industrial plants and other large customers, the growth in approved large loads and observed consumption is a reminder that the grid is absorbing new demand in real time. A queue that adds dispatchable supply could ease concerns about reliability, but only if projects actually reach commercial operation on a timeline that matches the load growth.
Utilities, regulators and ratepayers
ERCOT said in April that it would work with the Public Utility Commission of Texas on potential adjustments to how it identifies and verifies large-load demand for forecasting. The queue numbers offer one input into that debate: developers are clearly responding to the demand signals that state agencies have published, and the composition of what gets built will shape both reliability and wholesale prices for years.
Frequently Asked Questions
How much natural gas generation is in the ERCOT queue?
As of October 31, 2026, ERCOT reported 95,032 MW of active gas generation interconnection requests, up from 47,848 MW on October 31, 2025.
What is the largest fuel type in the ERCOT queue?
Battery storage remains the largest, with 160,102 MW, or 34.7% of queue capacity, followed by solar at 151,798 MW.
How many projects are in ERCOT’s interconnection queue?
ERCOT was tracking 1,847 active generation interconnection requests totaling 461,414 MW at the end of October 2026, plus 169 inactive projects.
What was ERCOT’s peak demand in October 2026?
ERCOT set an October record of 81,487 MW on October 13, 2026, based on preliminary data, 5,583 MW above the October 2025 peak.
Does the queue tell us what will be built?
No. The queue reflects requests for interconnection studies. Many projects are withdrawn, delayed or resized, so the queue is best read as a signal of developer interest rather than a construction forecast.
Sources and Further Reading
- ERCOT Monthly Operational Overview, October 2026, Electric Reliability Council of Texas
- ERCOT Monthly Operational Overview, October 2025, Electric Reliability Council of Texas
- Interconnection and Grid Analysis Update (Revised), ERCOT Board of Directors, September 2026, Electric Reliability Council of Texas
- ERCOT Releases Preliminary Long-Term Load Forecast for Years 2026-2032 for PUCT Discussion, Electric Reliability Council of Texas